OEM/ODM Customized Development Services
Retail readiness of promotional products&FBA compliant packaging factory
Requirement Analysis & Feasibility Study (Free)
After receiving your initial requirements, our project manager will conduct a 1-on-1 video call with you within 24 hours. We will thoroughly analyze your target market, budget range, expected sales volume, and launch timeline. Based on 15 years of industry experience, we will deliver a 《Product Development Feasibility Report》 within 48 hours, including:
- Technical difficulty assessment (1-5 stars)
- Estimated development timeline (from concept to mass production)
- Rough cost estimation (materials + molds + production)
- Potential risk points and mitigation strategies
Concept Design & Prototyping
Once the feasibility report is confirmed by you, our design team will commence the formal design process. This phase includes:
- 3D modeling and rendering (360° rotation view provided)
- Engineering drawings (including dimensions, tolerances, material specifications)
- DFM Analysis (Design for Manufacturability, identifying production risks)
- Material Selection Report (providing price comparison from 3 suppliers)
Prototype Manufacturing & Testing (Timeline: 5-10 days)
After design confirmation, we initiate prototype manufacturing:
- CNC Prototype: 1:1 physical model for appearance and function validation
- 3D Printing: Quick design detail verification (3-5 days)
- Functional Testing: Drop, pull, temperature change, wear resistance tests
- Cost Refinement: Precise mass production BOM cost calculation based on prototype (error <5%)
Tooling & Mass Production Preparation (Timeline: 4-6 days)
After prototype approval:
- Tooling Manufacturing: 45-60 day cycle, cost $3,000-$15,000 (depending on complexity)
- Trial Production 200pcs: Verify process stability, yield analysis
- Certification Pre-test: CE/FDA/LFGB pre-testing to avoid batch failures
- Supply Chain Lock: Bulk raw material procurement, price locked
Mass Production & Delivery(10-15 days)
After design confirmation, we initiate prototype manufacturing:
- Quality Control: Four-tier QC (incoming-in-process-100% inspection-random inspection)
- Certification Docs: Full compliance documents provided (CE/FDA/Reach/ROHS)
- Logistics Support: DDP door delivery, overseas warehouse dropshipping
Why Choose Our Development Team
15 Years of Product Development Experience
·Successfully developed over 500 products, covering 8 categories<br>
·The average development cycle is 30% faster than peers<br>
·The success rate of patent assistance applications is 85%
One-Stop Service Capability
·Design+mold+production+certification+logistics, no need to connect with multiple suppliers<br>
·Exclusive project manager 1-on-1 docking, WeChat group no more than 3 people<br>
·Transparent throughout the entire process, with daily progress photos/videos updated
Transparent Pricing & Risk Sharing
·Patent sharing: Jointly developing products, you have exclusive sales rights for the target market for 18 months<br>
·Mold ownership: After you pay the mold fee, ownership belongs to you, and we only provide OEM services
Global Compliance Experts
·Familiar with certification requirements of 80 countries such as CE/FDA/LFGB/Reach<br>
·Free compliance pre-approval to avoid batch failures<br>
·Provide compliance document package (sent 3-5 days later)
Frequently Asked Questions
What's your pricing structure for OEM and ODM?
- Tooling fee: $500-$15,000 (one-time, you own it)
- Development fee: $500-$2,000 (includes design + prototype, deductible from first order)
- Mass production price: Based on BOM cost + reasonable margin (15-30% higher than stock private label)
- R&D fee: $2,000-$8,000 (includes market research + design + testing)
- Tooling fee: $3,000-$15,000
- Mass production price: 20-40% higher than OEM (includes IP value)
- Development/tooling fees can be deducted as 30% credit for first order
- After 10,000 units produced, tooling fee fully refunded
How long does the development cycle typically take?
- From analysis to mass production: 90-120 days
- Design phase: 15-30 days
- Prototype: 15-30 days
- Tooling: 45-60 days
- Trial production: 5-7 days
- Total cycle compressed to: 60-75 days
- Parallel engineering: Design + tooling simultaneously
- Existing product with logo/material change: 15-30 days
- Minor changes (size adjustment): 7-15 days
How can we protect our design and patent?
- Sign tripartite NDA (you, us, tooling factory)
- Tooling contract clearly states 100% ownership belongs to you
- We promise not to use your design for other clients (20% sales penalty if violated)
- Key tooling components made by your designated supplier
- Design files managed in blocks, no single person has complete drawings
- Production batch coding system for full traceability
- Free assistance with design patent application (China) and US design patent
- Provide patent search report (avoid infringement risk)
- Technical disclosure documents held by you during development
What if product development fails or the market doesn't accept it?
- We bear development costs already incurred (if due to our assessment error)
- Tooling fee fully refunded (if due to our process issue)
- Bet Clause: If product doesn’t reach 50% of agreed sales volume within 6 months, refund 50% of R&D costs
- Exchange Policy: Can exchange for our stock products (at 80% of cost price)
- Recommend small trial production of 200-500pcs first to test market
- During trial production, we provide “Market Data Package” (Amazon competitor analysis, pricing suggestions)
Start your custom development project now
Three steps to start your OEM/ODM project
1. Submit your concept, sketch, or reference product. (Feasibility feedback within 24 hours)
2. Review design proposal and cost breakdown(3D rendering within 48 hours)
3. Approve sample and start tooling(Mold completion notification+trial production of 200pcs)
FAQ
Let’s first conduct a free feasibility analysis
We can complete the development in 60 days at the fastest
We have an agreement to guarantee it
Let’s have a 15 minute video to explain it clearly
